Kasikas: SM CDO2 as of today

These are the latest updates of the construction of SM CDO2 (the second mall of SM in Cagayan de Oro) posted on skyscrapercity.com. As shown in these photos, around four trucks arrived in the site loaded with steel rods. According to our source, these steel rods could have been delivered earlier had it not of the delays caused by Typhoon Ruby. Expect more steel materials to arrive in this site in the upcoming days.

There is a possibility that these will be used to start foundation construction, done earliest to allow the land to settle in for vertical construction. But for what it’s worth, we are assured that the mall will start rising soon.

Photo credits to the owner