MUST Engineering Building and Entrance Gate Updates

The facade of the new MUST Engineering Complex is now being finished. The partitions are now being constructed, which will possibly become commercial spaces. Wide stairs are also facing the road, which makes for a great looking facade.

DSC05677

The new gate is slowly being revealed. It follows the concentric shape of the west side of the building. It will then connect back the the original path at the Gymnasium and the new Cafteria.DSC05681DSC05674 DSC05742 DSC05724DSC05720MUST is slowly evolving to a well developed and well designed campus, from its humble beginnings as MPSC. We can’t wait to see what the university has in store for its students next.