Kasikas: MUST Eng’g Building Almost at the Top, Shopwise installs Brand

With the taller tower slated at 8 floors, and the lower building at 5, MUST is almost topping off the Engineering Building, with the final circular floor being constructed at the top of the right building. The top ceiling of the taller left building, as seen in the photo, is already covered in concrete. The lower portion fronting Gateway Park, previously the DOST X Building, is hollow but the foundations are retained, and some are speculating that this will house rentable spaces for commercial use.

Moving on, ShopWise, which will open November, is pumping up the excitement, and seen here is the big signage installed on the building.

DSC01130 DSC01128

Who’s excited for the opening of these buildings? Head on the comments and tell us how you feel about these developments.